Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Filters:
EDITION
to
PUBLISHER
(1)
(343)
(623)
(599)
(55)
(234)
(1019)
(696)
(2187)
(117)
(95582)
(63)
(590)
(124)
(33)
(24)
(20)
(96542)
(17)
(1)
(374)
(325)
(7302)
(241)
(21)
(7)
(1669)
(18)
(19)
(28)
(4)
 
(6)
(7)
(115)
(1)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(28)
(27)
(30)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(33)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Product - Data Sheet
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Sustainability
 Technical Bulletin
 All
  • NFPA
    NFPA 853: Installation of Stationary Fuel Cell Power Plants
    This title can only be subscribed to with another NFPA title (See details)
    Edition: 2003
    $197.13
    / user per year

Description of NFPA 853 2003

Per NFPA's requirements, when purchasing NFPA 2021 Standards and/or 2020 NFPA 70 (NEC), you must subscribe to at least one more NFPA Standard to complete your purchase. In order to fulfill this requirement, we automatically add 2019 NFPA 900 to your cart. This title may be removed during checkout if you choose to add a different NFPA standard to your cart, and pricing will be recalculated accordingly.

Broader in scope to address fuel cell plants of all sizes!

NFPA 853 specifically addresses fire protection requirements for fuel cell power plants. Whereas the 2000 edition covered only stationary fuel cell power plants above 50 kW, the scope of the 2003 NFPA 853 has been expanded to address the design, construction, and installation of stationary fuel cell power plants of all sizes. This major change was made in response to the developing market in smaller stationary fuel cell power plants. The Standard has been revised accordingly to reflect the fire protection needs for both small and large stationary fuel cells.

Turn to this document to find updated guidelines for:

  • General equipment configuration
  • Siting and interconnections
  • Fuel supplies and storage arrangements
  • Ventilation and exhaust
  • Fire protection
  • Fuel cell power systems 50 kW or less


GROUPS