FORMAT
EDITION
PUBLISHER
CONTENT TYPE
Act
Admin Code
Announcements
Bill
Book
CADD File
CAN
CEU
Charter
Checklist
City Code
Code
Commentary
Comprehensive Plan
Conference Paper
County Code
Course
DHS Documents
Document
Errata
Executive Regulation
Federal Guideline
Firm Content
Guideline
Handbook
Interpretation
Journal
Land Use and Development
Law
Legislative Rule
Local Amendment
Local Code
Local Document
Local Regulation
Local Standards
Manual
Model Code
Model Standard
Notice
Ordinance
Other
Paperback
PASS
Periodicals
PIN
Plan
Policy
Product
Product - Data Sheet
Program
Provisions
Requirements
Revisions
Rules & Regulations
Standards
State Amendment
State Code
State Manual
State Plan
State Standards
Statute
Study Guide
Supplement
Sustainability
Technical Bulletin
All
|
Description of BS EN IEC 62271-211:2024 - TC 2024IEC 62271-211:2024 is applicable to single- and three-phase direct connections between gas-insulated metal-enclosed switchgear (GIS) for rated voltages above 52 kV and transformer arrangements to establish electrical and mechanical interchange ability and to determine the limits of supply for the transformer connection. This second edition cancels and replaces the first edition of IEC 62271-211:2014. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) re-numbering of clauses according to IEC 62271-1:2017, b) Clause 3: updating definition about bushing (3.1), updating some pressure definitions (3.6, 3.7, 3.8, 3.9), rewording definition about proctor density (3.11), new term very-fast-front overvoltage (3.12), c) Clause 5 (former clause 4): add a subclause 5.1 General, according to IEC 62271-1:2017 and IEC 62271-203:2022, 1) subclause 5.5: new first paragraph, rewording second paragraph, 2) subclause 5.8: modify the term "Rated duration of thermal short-time current" of the bushing, d) Clause 6 (former Clause 5): restructure and rewording of subclauses: 1) 6.1 (former 5.3): requirements about gas and vacuum tightness of the transformer bushing 2) 6.3 (former 5.2): harmonization with IEC 62271-203:2022 about typical maximum pressure in service for SF6, other gases and gas mixtures, 3) 6.4 (former 5.8), rewording 4) 6.5 (former 5.1), some rewording and modification 5) 6.6 (former 5.4), some rewording, updated references 6) 6.7 (former 5.5), some rewording 7) 6.8 (former 5.6), some rewording 8) 6.9 (former 5.7), slight rewording, e) Clause 7 (former clause 6) type tests: some rewording and clarifications about references, f) Clause 8 (former clause 7) routine tests: 1) 8.2 (former 7.2): add a paragraph about SF6-mixtures and other gases than SF6, 2) 8.3 (former 7.3): update reference to relevant on-site test according to IEC 62271‑203:2022, g) Clause 9 Guide to the selection of switchgear and controlgear (new): informative, to have a reference to IEC 62271-203:2022, h) Clause 11 (former 10): updated headline and updated reference according to IEC 62271‑1:2017, i) new Clauses 12 Safety and 13 Environmental aspects: Adding of references to safety and environmental aspects, j) correction of errors in Corrigendum 2 of IEC 62271-211:2017, k) modified orientation of Figure 1 to Figure 4 for easier reading of the tables.
About BSIBSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses. |
GROUPS
|