GSA PBS Project Management Guide, 0
- Project Delivery Method - Design/Build-Bridging [Go to Page]
- 2.0.0.0.0.0 Planning [Go to Page]
- 2.1.0.0.0.0 Pre-Project Planning (Overview)
- 2.1.0.0.0.1 Pre-Project (Preliminary) Planning
- 1.1.0.0.0.0.a Project Coordination
- 1.1.1.0.0.0.a PMP: Assemble Project Team
- 2.1.12.0.2.0 Existing Conditions Assessments
- 2.1.10.0.0.0 Local Portfolio Plans
- 2.1.1.0.0.0 Campus/Facility Master Plans
- 2.1.3.0.0.0 Building Engineering Report
- 2.1.4.0.0.0 Accessibility Survey
- 2.1.3.1.0.0 Fire/Life Safety Study
- 2.1.5.0.0.0 Hazardous Materials Survey
- 2.1.6.0.0.0 Highest and Best Use Appraisal (R&A)
- 2.1.8.0.0.0 Safety/Security Study(ies)
- 2.1.9.0.0.0 Energy Conservation Audit
- 2.4.1.0.0.0.a Feasibility
- 2.4.1.0.0.0.b Feasibility (Continued)
- 6.3.0.0.0.0 CMa/Commissioning Authority (Cx) Services
- 6.1.0.0.0.0.a Project Consultant Task Order
- 2.4.1.0.0.0.c Feasibility: R&A
- 2.4.1.0.0.0.d Feasibility: New Construction
- 2.4.1.0.0.0.e Feasibility: Lease Construction
- 4.0.0.0.0.0.a Site Acquisition
- 4.0.0.0.0.0.b Site Investigation Tasks for FS
- 4.0.0.0.0.0.c Site Investigation for FS
- 2.2.0.0.0.0 NHPA Tasks for FS through Site Acquisition
- 2.3.0.0.0.0 NEPA Tasks for FS through Site Acquisition
- 2.6.0.0.0.0 Relocation Planning
- 1.1.2.0.0.0 Commissioning Authority (Cx) (Overview)
- 1.1.1.0.0.0.b Project Management Plan (PMP)
- 1.1.1.0.0.0.c Acquisition Plan Program/Project
- 1.1.1.0.0.0.d Procurement Snapshot
- 1.1.1.0.0.0.e Procurement Snapshot (Continued)
- 1.1.3.1.0.0 Initiate Project in PIP
- 1.1.3.2.0.0 Project Updates in PIP
- 1.1.5.0.0.0 Project Website(s)
- 2.4.4.0.0.0 Project Funding Request 3.4.5.0.0.0 Budget Authorization Act (Congressional Approval)
- 6.1.1.0.1.0 Courthouse Orientation and Design Start Workshop
- 2.5.0.0.0.0 Program Development Study (PDS)
- 3.4.0.0.0.0 Construction Authorization (Prospectus)
- 6.0.0.0.0.0 Design [Go to Page]
- 4.1.0.0.0.0 Site Selection/Technical Studies: NHPA and NEPA Process (Overview)
- 4.2.0.0.0.0 Site Acquisition (Overview)
- 6.2.0.0.0.0 A/E Procurement (Overview)
- 6.2.1.0.0.0.a A/E Services Scope of Work (Overview)
- 6.4.2.0.0.0 Source Selection Plan
- 6.2.1.0.0.0.b Design Charrette (Optional)
- 6.2.1.0.0.0.c Design Competition
- 6.2.2.0.0.0, 6.2.4.0.0.0, and 6.2.5.0.0.0 A/E Source Selection/Evaluation Process
- 6.2.6.0.0.0 A/E Contract for Design
- 6.3.1.0.0.0.a CMa Scope of Work
- 6.3.1.0.0.0.b CxA Scope of Work (if apart from CMa)
- 6.3.1.0.0.0.b CxA Scope of Work (if apart from CMa)
- 6.1.0.0.0.0.b Art-in-Architecture Contract
- 6.7.0.0.0.0 Concept Design (Overview)
- 6.7.0.0.0.1.a Concept Design
- 6.7.0.0.0.1.b Concept Design (Continued)
- 6.7.2.0.0.0 Concept Design Partnering Workshop
- 6.7.4.0.0.0 Design Charrette Documents
- 6.7.7.0.0.0 Design Excellence Peer Review
- 6.7.6.3.0.0 Concept Design Review Comments Including Concept Design Selection and 6.7.9.0.0.0 VE Workshop
- 6.7.12.2.0.0 Concept Design Review Comments (Urban Design Review Boards)
- 6.7.14.0.0.0 Final Concept Presentation to the Commissioner 6.7.15.0.0.0 Final Concept Approval Memorandum
- 6.7.14.0.1.0 Art-in-Architecture Concept Design
- 6.8.0.0.0.0 Design Development (Overview)
- 6.8.0.0.0.1 Design Development (Process)
- 6.8.0.0.0.2 Utility Rebate Program Review
- 6.8.1.0.0.0 DD Program Review Workshop
- 6.8.2.0.0.0 DD Systems Selection Analyses
- 6.8.5.0.0.0 DD Submission (35%)
- 6.8.9.0.0.0 Construction Strategy/Phasing Plan
- 6.8.11.0.0.0 Independent OCA PBS-P100 Review and IGE
- 7.0.0.0.0.0 Construction [Go to Page]
- 6.10.0.0.0.0 Construction Procurement
- 6.10.1.0.0.0 GC/CC Source Selection Plan
- 6.10.2.0.0.0 Advertisement for Construction Services
- 6.10.4.0.0.0 Pre-Proposal Conference
- 6.10.11.0.0.0 Proposal Document Addenda
- 6.10.1.1.0.0 GC/CC Selection Evaluation Factors (Phase I) 6.10.8.0.0.0 GC/CC Evaluations/Selection (Phase I)
- 6.10.13.0.0.0 GC/CC Evaluations/Selection (Phase II)
- 6.10.14.0.0.0 Construction Contract Award and 6.10.15.0.0.0 Pre-NTP Documents (Bonds, Insurance, Security, etc.)
- 7.1.0.0.0.0 (0% to 100% Construction)
- 7.1.1.0.0.0 Notice To Proceed
- 6.9.0.0.0.0 Construction Documents
- 6.9.3.0.0.0 CD Program Review Workshop (CD Start) 6.9.10.0.0.0 CD Program Review Workshop (90%)
- 6.7.13.0.0.0 Independent OCA PBS-P100 Review 6.7.13.0.0.0 Independent OCA PBS-P100 Review
- 6.7.12.0.0.0 CMa's CD Review/Estimate (100% CDs)
- 6.10.16.0.0.0 Professional Services Task Orders (Construction)
- 7.1.4.0.0.0 Art-in-Architecture Fabrication Task Order
- 7.1.2.0.0.0 Construction Kick-off Meeting
- 7.1.3.0.0.0.a Partnering Session
- 7.1.3.0.0.0.b Partnering Session: Timing Benefits and Drawbacks
- 7.1.5.0.0.0 Groundbreaking/Construction Start
- 7.1.6.0.0.0.a Construction Administration
- 7.1.6.0.0.0.b Construction Administration (Overview)
- 7.1.6.0.0.1.a Construction Administration: Safety
- 7.1.6.0.0.1.b Construction Administration: Project Cost Management
- 7.1.6.0.0.1.c Requests for Information (RFI)
- 7.1.6.2.0.0 Construction Schedules
- 7.1.6.4.0.0 Submittal Schedule/Log/Submissions
- 7.1.2.0.1.2 Quality Assurance Quality Control Plans/Reports (QAQC Review Process)
- 7.1.6.5.0.0 Inspections and Testing Schedule
- 7.1.6.6.0.0 Special Testing/Mock-up Plans/Reports
- 7.1.6.1.1.1 Project Web-Cam
- 7.1.6.8.0.0 GC/CC Contract Modifications
- 7.1.9.0.0.0 GC/CC Evaluations (NIH)
- 7.1.7.0.0.0 CII Benchmarking
- 7.1.10.0.0.0 Follow-up Partnering Session
- 7.1.8.0.0.0 Construction Excellence Peer Review (1st) 7.1.11.0.0.0 Construction Excellence Peer Review (2nd)
- 7.1.12.0.0.0 Art-In-Architecture Deliverable
- 7.1.13.0.0.0 Additional Phases Delivery (TI, Phases, Annexes)
- 7.1.14.0.0.0 Turnover Documents
- 7.1.14.3.0.0 O&M Manuals Submittal
- 7.1.14.4.0.0 Warranties and Certifications
- 7.1.14.6.0.0 Material Samples, Attic Stock and Spare Parts
- 7.1.14.7.0.0 Contractor Record Drawings
- 7.1.14.2.0.0 Systems Start-Up and Testing (Commissioning)
- 7.1.14.5.0.0 Property Management Training
- 7.1.15.0.0.0.a Substantial Completion Certification
- 7.1.15.0.0.0.b Substantial Completion Certificate:Final Cleaning
- 7.1.16.0.0.0 Occupancy Permit
- 7.1.14.1.0.0.a Final Inspections
- 7.1.14.1.0.0.b Punch Lists
- 7.1.15.0.0.0.c Substantial Completion Certificate: Final Completion
- 7.2.0.0.0.0 Closeout (Admin)
- 8.3.4.0.1.2 Maintenance and Cleaning Contracts (GC/CC Option)
- 7.2.1.0.0.0 A/E Record Documents
- 7.2.2.0.0.0 Updated PBS CAD Library Submission
- 7.2.4.0.0.0 Dedication Ceremony Documents
- 7.2.5.0.0.0 Project Awards (LEED, EnergyStar, AiA, PM, etc.)
- 7.2.3.1.0.0 Contract Closeout (GC/CC)
- 7.2.3.2.1.0 Project Management Closeout
- 7.2.3.2.0.0 Financial Closeout
- 8.1.3.0.1.0 Real Property Acquisition Advice (GSA Form 1011)
- 8.0.0.0.0.0 Tenant Occupancy [Go to Page]
- 8.1.0.0.0.0 Occupancy Agreements and RENT (Overview)
- 8.1.1.2.2.0.a Occupancy Agreement Planning Phase (Initial Draft)
- 8.1.1.3.0.0 Occupancy Agreement based on PDS-(Proposed Draft)/Updates
- 8.1.1.4.0.0 Concept Design 8.1.1.4.1.0 Design Development 8.1.1.4.2.0 Mid-Point Construction Documents 8.1.1.4.2.0 Mid-Point Construction Documents
- 8.1.1.2.2.0.b Occupancy Agreement (Accepted Draft): Before Construction Award
- 8.1.1.3.1.0 Occupancy Agreement (Accepted Draft): During Construction
- 8.1.1.5.0.1 Final Occupancy Agreement
- 8.1.1.5.0.0 Final Occupancy Agreement (Reconciliation)
- 8.1.2.0.0.0 National CAD/CIFM Standards
- 8.1.3.0.0.0 Initial RENT Start
- 8.2.0.0.0.0 Furniture, Fixtures, and Equipment (FFE)/Move-In (Overview)
- 8.2.1.0.0.0 Systems Furniture
- 8.2.2.0.0.0.a Telecommunications Installation - R&
- 8.2.2.0.0.0.b Telecommunications Installation - New Construction
- 8.2.3.0.0.0 Agency IT/Data Systems
- 8.2.4.0.0.0 Security Systems Installation
- 8.2.5.0.0.0 USMS A/V and Security Systems Installation
- 8.2.6.0.0.0 Tenant Move-In [Go to Page]