Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
FEMA P-2055, Post-disaster Building Safety Evaluation Guidance, 2020
- FEMA P-2055
- Post-disaster Building Safety Evaluation Guidance – Report on the Current State of Practice, including Recommendations Related to Structural and Nonstructural Safety and Habitability
- Foreword
- Preface
- Executive Summary
- Table of Contents
- List of Figures
- List of Tables
- Chapter 1: Introduction [Go to Page]
- 1.1 Legislative Mandate
- 1.2 Purpose and Scope of Guide
- 1.3 Target Audience
- 1.4 What is Covered
- 1.5 Organization of Guide
- Chapter 2: Context of Post-disaster Building Safety Evaluations [Go to Page]
- 2.1 Overview
- 2.2 Well-established Post-disaster Building Safety Evaluation Guidance
- 2.3 FEMA Grant Assistance for Post-disaster Building Safety Evaluations [Go to Page]
- Safety Inspections
- 2.4 Other Types of Building Assessments [Go to Page]
- 2.4.1 Preliminary Damage Assessment
- 2.4.2 FEMA Home Inspections [Go to Page]
- Resources
- 2.4.3 FEMA Public Assistance Site Visits and Inspections [Go to Page]
- Resources
- 2.4.4 Substantial Damage Determinations [Go to Page]
- Resources
- 2.4.5 FEMA Building Performance and Mitigation Assessment Teams [Go to Page]
- Resources
- 2.4.6 Utility Inspections
- 2.4.7 Insurance Claim Assessment
- 2.4.8 Research Organization Assessments
- 2.5 Building Code Administration and Enforcement Requirements for Building Safety Evaluations
- 2.6 Resources for Building Safety Evaluations under the National Incident Management System
- Chapter 3: Structural and Nonstructural Safety Evaluation [Go to Page]
- 3.1 Overview
- 3.2 Earthquakes [Go to Page]
- Best Practice
- Additional Discussion and Needs
- 3.3 Windstorms and Floods [Go to Page]
- Best Practice
- Additional Discussion and Needs
- 3.4 Land Instability [Go to Page]
- Best Practice
- Additional Discussion and Needs
- 3.5 Volcanic Eruptions [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- Resources
- 3.6 Hail Storms [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- 3.7 Snow and Ice Storms [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- Resources
- 3.8 Fire [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- Resources
- 3.9 Explosion [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- 3.10 Multi-hazard Incidents [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- Resources
- 3.11 Evaluation of Historic and Cultural Resources [Go to Page]
- Best Practice
- Additional Discussion and Needs
- Resources
- Chapter 4: Habitability Evaluation and Other Considerations [Go to Page]
- 4.1 Overview
- 4.2 FEMA Policies on Habitability
- 4.3 Habitability Evaluation Approaches and Evaluator Skills [Go to Page]
- 4.3.1 Habitability Evaluation Approaches
- 4.3.2 Evaluator Skills Needed
- 4.4 Environmental Hazard Evaluation [Go to Page]
- Best Practice
- Interim Recommendation
- Additional Discussion and Needs
- 4.4.1 Natural Gas
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.2 Carbon Monoxide
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.3 Chemical Release
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.4 Soot and Fumes
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.5 Blackwater, Sewage, and Mold
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.6 Asbestos
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.7 Lead-Based Paint
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.8 Parasites
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.9 Wild, Stray, and Dead Animals
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.10 Biting and Stinging Insects
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.4.11 Debris and Refuse
- Best Practice Evaluation Strategy for Building Safety Evaluator
- 4.5 Building Systems and Services: Permanent Standards and Potential Temporary Standards [Go to Page]
- 4.5.1 Mechanical, Electrical, and Plumbing Services
- 4.5.1.1 Pre-disaster Building Code Requirements
- 4.5.1.2 Potential Temporary Standards after a Disaster
- Interim Recommendation
- 4.5.2 Fire Alarm, Carbon Monoxide Alarm, and Fire Protection Services
- 4.5.2.1 Pre-disaster Building Code Requirements
- 4.5.2.2 Potential Temporary Standards after a Disaster
- Interim Recommendation
- 4.6 Other Code Issues: Permanent and Potential Temporary Standards [Go to Page]
- 4.6.1 Habitable Space
- 4.6.1.1 Pre-disaster Building Code Requirements
- 4.6.1.2 Potential Temporary Standards after a Disaster
- 4.6.2 Means of Egress/Emergency Escape
- 4.6.2.1 Pre-Disaster Building Code Requirements
- 4.6.2.2 Potential Temporary Standards After a Disaster
- 4.6.3 Accessibility for Persons with Disabilities, Access and Functional Needs, and Seniors
- 4.6.3.1 The Americans with Disabilities Act (ADA)
- 4.6.3.2 The Fair Housing Act
- 4.6.3.3 Pre-disaster Requirements
- 4.6.3.4 Issues to Consider
- 4.6.3.5 Temporary Standards After a Disaster
- 4.6.4 Security
- 4.6.4.1 Pre-disaster Building Code Requirements
- 4.6.4.2 Issues to Consider
- 4.6.4.3 Potential Temporary Standards after a Disaster
- 4.7 Application to Non-Residential Occupancy Types
- 4.8 Framework for Developing Temporary Habitability Policies [Go to Page]
- 4.8.1 Interim Post-disaster Use of Residential Buildings
- 4.8.2 Example Temporary Habitability Standard after a Disaster
- 4.8.3 Issues to Consider in Developing Temporary Habitability Standards
- 4.8.3.1 Technical Questions
- 4.8.3.2 Administrative and Policy Questions
- 4.8.4 Approach Options for Implementing Temporary Habitability Policies
- Chapter 5: Pre-disaster Program Management [Go to Page]
- 5.1 Overview
- 5.2 Pre-planning [Go to Page]
- Interim Recommendation
- 5.3 Resource Typing [Go to Page]
- Best Practice [Go to Page]
- Post-disaster Building Safety Evaluator
- Post-disaster Building Safety Evaluation Strike Team Leader
- Post-disaster Building Safety Evaluation Strike Team Technical Supervisor
- Post-disaster Complex Structural Condition Evaluator
- Post-disaster Complex Architectural System Condition Evaluator
- Post-disaster Building Safety Evaluation Team
- Post-disaster Building Safety Evaluation Strike Team
- Organization Chart
- Additional Resource Types
- 5.4 Certification and Training [Go to Page]
- 5.4.1 Post-disaster Building Safety Evaluators [Go to Page]
- Best Practice
- Additional Discussion and Needs
- 5.4.2 Emergency Management Personnel [Go to Page]
- Interim Recommendations
- Additional Discussion and Needs
- 5.5 Mutual Aid Resources and Agreements [Go to Page]
- 5.5.1 Emergency Management Assistance Compact
- 5.5.2 Other Mutual Aid Systems [Go to Page]
- Best Practice
- Additional Discussion and Needs
- 5.6 Volunteers, Liability, Good Samaritan Laws, and Workers’ Compensation [Go to Page]
- 5.6.1 Good Samaritan Laws
- 5.6.2 Federal Volunteer Protection Act
- 5.6.3 Workers’ Compensation
- 5.6.4 Portability of Licensure [Go to Page]
- Best Practice
- Interim Recommendation
- Additional Discussion and Needs
- Resources
- 5.7 Necessary Laws and Policies [Go to Page]
- Interim Recommendation
- Resources
- Chapter 6: Post-disaster Program Management and Implementation [Go to Page]
- 6.1 Overview
- 6.2 Implementing the Post-disaster Safety Evaluation Section of the Emergency Management Plan [Go to Page]
- Best Practice
- 6.3 Deployment Safety and Tools [Go to Page]
- 6.3.1 Recommended Equipment for Personal Safety of Evaluators
- 6.3.2 Safety from Environmental Hazards
- Best Practice
- 6.3.3 Field Tools and Resources for Evaluators
- Best Practice
- 6.4 Evaluation Prioritization [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- 6.5 Deployment Resources [Go to Page]
- 6.5.1 National Level
- Best Practice
- 6.5.2 State Level
- Best Practice
- Interim Recommendation
- 6.6 Data Collection and Reporting [Go to Page]
- Best Practice
- Interim Recommendation
- 6.7 Quality Assurance [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- 6.8 Reevaluation Triggers [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- 6.9 Changing or Removing a Placard [Go to Page]
- Interim Recommendation
- Additional Discussion and Needs
- 6.10 Cordoning and Barricading [Go to Page]
- Best Practice
- Additional Discussion and Needs
- 6.11 Communication with the Public, the Media, and Building Owners and Occupants [Go to Page]
- Interim Recommendation
- Chapter 7: Emerging Technologies and Development Needs [Go to Page]
- 7.1 Overview
- 7.2 Building Owner’s Guide to Safety Assessment [Go to Page]
- Recommendations
- 7.3 Emerging Technologies [Go to Page]
- 7.3.1 Social Media
- 7.3.2 Machine Learning and Artificial Intelligence
- 7.3.3 Strong-motion Data
- 7.3.4 Geospatial Data
- 7.3.5 Aerial Vehicles
- 7.3.6 Other Technologies and Applications
- Recommendations
- Chapter 8: Conclusions and Recommendations [Go to Page]
- 8.1 Guide Overview
- 8.2 Key Conclusions
- 8.3 Best Practices for Post-disaster Building Safety Evaluators
- 8.4 Best Practices for Emergency Managers and Building Officials
- 8.5 Best Practices for Policy Makers
- Appendix A: Glossary and Acronyms [Go to Page]
- A.1 Glossary
- A.2 Acronyms
- Appendix B: Referenced Codes and Standards
- References
- Project Participants
- Back Cover [Go to Page]