Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
, 2024
- ASHRAE Online Bookstore
- SSPC300 Common Annexes
- Addenda
- Errata
- Return to Previous Page
- ANSI/ASHRAE/IES Standard 202-2024 [Go to Page]
- Contents
- Foreword
- 1. Purpose
- 2. Scope [Go to Page]
- 2.1 This standard applies to
- 2.2 This standard provides procedures, methods, and, documentation requirements for each activity for project delivery, from predesign through occupancy and operations, including
- 3. Nomenclature [Go to Page]
- 3.1 Definitions
- 3.2 Abbreviations, Acronyms, and Initialisms
- 4. Utilization [Go to Page]
- 4.1 Introduction. The application of this standard can be for the delivery of all or selected systems and assemblies in a project. The scope will depend on how the project is designed, built, and operated. The scope shall be defined in the Owner’s ...
- 4.2 Requirements
- 4.3 Acceptance. The process for each activity and deliverable shall include an acceptance step as defined in the OPR and reflected in the contract documents and associated Cx Plan. This step shall formalize the acceptance of the Cx deliverable by the...
- 5. Initiating the Commissioning Process [Go to Page]
- 5.1 General
- 5.2 Cx Requirements
- 6. Owner’s Project Requirements [Go to Page]
- 6.1 Introduction. The Owner’s Project Requirements (OPR) form the foundation for the design, construction, and occupancy and operation of the facility and is the basis for the Commissioning Process (Cx) Plan and schedule. The OPR document evolves o...
- 6.2 Requirements
- 6.3 Acceptance
- 7. Commissioning Process Plan [Go to Page]
- 7.1 Introduction. The Commissioning Process (Cx) Plan shall be a written document and provide organization, documentation requirements, and tools to evaluate and document that the design, construction, and operation of the project or facility, system...
- 7.2 Requirements
- 7.3 Acceptance
- 8. Basis of Design [Go to Page]
- 8.1 Introduction. The Basis of Design (BoD) is a written document that shall provide detailed information on the Design Team’s approach to meeting the OPR to provide the Owner with a better understanding of design issues and secure the Owner’s ap...
- 8.2 Requirements
- 8.3 Acceptance
- 9. Contractor, Supplier, and Manufacturer Commissioning Requirements [Go to Page]
- 9.1 Introduction. The responsibilities of the contractors, suppliers, and manufacturers, including those contracted directly to the Owner, shall follow the contract documents, including Commissioning Process (Cx) Activities and procedures defined by ...
- 9.2 Requirements
- 9.3 Acceptance
- 10. Design Review [Go to Page]
- 10.1 Introduction. A Commissioning Process (Cx) Design Review shall be performed to evaluate compliance with the Owner’s Project Requirements (OPR).
- 10.2 Requirements
- 10.3 Acceptance
- 11. Commissioning Submittal Review [Go to Page]
- 11.1 Introduction. For construction or renovation projects requiring contractor or supplier submittals, a submittal documents review for commissioned systems and assemblies shall be performed to evaluate compliance with the Owner’s Project Requirem...
- 11.2 Requirements
- 11.3 Acceptance
- 12. Construction Observation and Testing [Go to Page]
- 12.1 Introduction. The proper installation, coordination, testing, and interaction among commissioned systems and assemblies shall be evaluated.
- 12.2 Requirements
- 12.3 Acceptance
- 13. Issues and Resolution Documentation [Go to Page]
- 13.1 Introduction. Issues identified during the Commissioning Process (Cx) shall be documented and any open or continuing items listed in an issues and resolution log.
- 13.2 Requirements
- 13.3 Acceptance
- 14. Systems Manual [Go to Page]
- 14.1 Introduction. The Systems Manual documentation shall be provided to the Owner for use in building operation and the training of personnel.
- 14.2 Requirements
- 14.3 Acceptance
- 15. Training [Go to Page]
- 15.1 Introduction. The operations and maintenance (O&M) personnel and occupants shall be trained on the systems being commissioned, in accordance with the Owner’s Project Requirements (OPR), to operate and maintain the building systems and assembli...
- 15.2 Requirements
- 15.3 Acceptance
- 16. Postoccupancy Operation [Go to Page]
- 16.1 Introduction. Postoccupancy operation commissioning, including delayed and seasonal testing and warranty issues, shall be provided prior to the time of warranty completion to deliver buildings and construction projects that meet the Owner’s ne...
- 16.2 Requirements
- 17. Commissioning Reports [Go to Page]
- 17.1 Introduction. A Preliminary Commissioning Process (Cx) Report shall be provided to summarize the Cx around the time of substantial completion and initial occupancy. This report shall assist the Owner in deciding whether the commissioned equipmen...
- 17.2 Requirements
- 17.3 The Preliminary Cx Report shall include a copy or the location of the following:
- 17.4 The Final Cx Report shall include a copy or the location of the following:
- 17.5 Acceptance
- Informative Appendix A: Standard 202-2024 Crosswalk
- Informative Appendix B: Addenda Description [Go to Page]