Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ASHRAE Guide for HVAC in Hazardous Spaces, 2021
- Dedication
- About the Author
- Contents
- Preface
- Acknowledgments
- 1 - Introduction [Go to Page]
- Definitions
- Additional Sources of Information
- 2 - Applicable Hazardous Substances [Go to Page]
- Toxic Substances
- Asphyxiating Substances
- Flammable and Combustible Substances
- Corrosive Substances
- Conclusion
- 3 - Sources of Hazards in Relationship to Protected Spaces [Go to Page]
- External Sources
- Internal Sources [Go to Page]
- Contained Sources
- Uncontained Sources
- Fugitive Emission Sources
- Horizontal Surface Sources
- Limited and Unlimited Releases
- Flow Modeling of Sources
- Combined Sources
- Synopsis
- 4 - Protection Methods [Go to Page]
- Ventilation [Go to Page]
- Positive Ventilation
- Negative Ventilation
- Potential Adverse Effects
- Ventilation Inlet and Outlet Locations
- Air Changes per Hour or Flow Rate
- Monitoring, Alarm, and Performance
- Natural Ventilation
- Emergency Ventilation
- Pressurization [Go to Page]
- Principles of Operation
- Monitoring, Alarm, and Performance Requirements
- Dilution [Go to Page]
- Principles of Operation
- Monitoring, Alarm, and Performance Requirements
- Filtration [Go to Page]
- Particulate Collection Air Filters
- Deep-Bed or Gas-Phase Chemical Scrubbers
- Electrostatic Precipitation Air Filters
- Cyclonic Air Filters
- Containment, Isolation, and Removal of Airborne Dusts and Particles
- 5 - Protected Space Integrity [Go to Page]
- General Construction Assessment
- Electrical Conduit Entry Assessment
- Piping, Ducting, and Plumbing System Drain and Vent Assessments
- Interior Construction Assessment [Go to Page]
- Vapor Barriers
- Isolated Area Assessment
- Design Considerations for Dust Hazards
- Design Considerations for Blast-Rated Spaces
- Design Considerations for Blast-Vented Spaces
- Synopsis
- 6 - Equipment Selection Criteria [Go to Page]
- Housings and Component Materials [Go to Page]
- Noncorrosive Conditions
- Corrosive Conditions
- Fan Blade and Blower Wheel Materials
- Protection System Equipment Electrical Ratings [Go to Page]
- Surrounding Atmosphere Classification
- Protected Space Classification
- Equipment Rating Establishment
- Air-Conditioning System Equipment Electrical Ratings
- Electric Heating Equipment Electrical Ratings
- Equipment Sizing, Redundancy, and Safety Factors
- 7 - Associated Equipment Design and Installation Requirements [Go to Page]
- Intake Duct and Stack Pipe Design and Installation
- Contaminant-Free Air Inlet and Exhaust Vent Design and Installation
- Room Pressure and Airflow Sensor and Switch Design and Installation
- Gas Detection System Design and Installation
- Alarm System Design and Installation
- Emergency Shutdown and Ventilation Switch Design and Installation
- 8 - System Maintenance [Go to Page]
- Establishment of Preventive Maintenance Procedures
- 9 - System Operation
- References [Go to Page]