Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
IEEE Guide for Maintenance Methods on Energized Power Lines (Redline), 2009
- Title page
- Introduction
- Notice to users [Go to Page]
- Laws and regulations
- Copyrights
- Updating of IEEE documents
- Errata
- Interpretations
- Patents
- Participants
- Contents
- Important notice
- 1. Overview [Go to Page]
- 1.1 Scope
- 1.2 Purpose
- 1.3 Application
- 2. Normative references
- 3. Definitions, acronyms, and abbreviations [Go to Page]
- 3.1 Definitions
- 3.2 Acronyms and abbreviations
- 4. Technical considerations [Go to Page]
- 4.1 Introduction
- 4.2 Insulating properties
- 4.3 Air as insulation
- 4.4 Factors that affect the air insulation
- 4.5 Air gap distances
- 4.6 Distance equations
- 4.7 Factors used to determine MAID, MTID, MAD, Mad for Tools, and MHAD
- 4.8 Control of TOVs
- 4.9 Application of MAID, MTID, MAD, MAD for Tools, and MHAD
- 4.10 Insulation systems
- 5. Tools and equipment [Go to Page]
- 5.1 Categories of insulating tools and equipment
- 5.2 Equipment rating
- 5.3 Electrical current flows
- 5.4 Tool and equipment testing
- 5.5 Testing of FRP live work tools
- 5.6 Typical tests for insulating tools
- 5.7 Worksite procedures
- 5.8 Shop or laboratory procedures
- 5.9 Insulating rope
- 5.10 Histograms
- 5.11 Electrical test references
- 5.12 Marking and identification—general
- 5.13 Restoration or temporary structures
- 6. In-service checking and care of insulated tools and equipment [Go to Page]
- 6.1 Introduction
- 6.2 Scope
- 6.3 Field care, handling, and storage
- 6.4 Periodic inspection and checking
- 6.5 Maintenance and repair of tools and equipment
- 7. Work methods [Go to Page]
- 7.1 Introduction
- 7.2 Categories of energized-line maintenance
- 7.3 Precautions when working energized lines
- 7.4 Requirements when working energized lines
- 7.5 Insulating equipment used in energized-line work
- 7.6 Noninsulating equipment used in energized-line work
- 7.7 Insulating devices used in energized-line work
- 7.8 Methods for positioning personnel
- 7.9 Insulator cleaning
- 8. Work in the vicinity of energized lines and devices [Go to Page]
- 8.1 Introduction
- 8.2 Physiological aspects of live-line work
- 8.3 Flame-resistant clothing
- 8.4 RF field protection
- 8.5 Precautions when performing live work
- 8.6 Step and touch voltages
- 8.7 Mechanical equipment
- Annex A (informative) Bibliography
- Annex B (informative) Sample distance calculations
- Annex C (informative) Sample PPAG calculations
- Annex D (informative) Distance tables
- Annex E (informative) Determining maximum anticipated per-unit TOV (T) [Go to Page]