Historical Standard: ASTM E2691-09 Standard Practice for Job Productivity Measurement
SUPERSEDED (see Active link, below)
ASTM E2691
1. Scope
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557 , and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.
1.2 JPM measures labor productivity of the installation processes on a construction job.
1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.
1.4 JPM takes into account the difficulty of installation at any given point on a job.
1.5 JPM evaluates relative productivity changes using trend monitoring.
2. Referenced Documents (purchase separately) The documents listed below are referenced within the subject standard but are not provided as part of the standard.
ASTM Standards
E631 Terminology of Building Constructions
E833 Terminology of Building Economics
E1557 Classification for Building Elements and Related Sitework--UNIFORMAT II
E1946 Practice for Measuring Cost Risk of Buildings and Building Systems and Other Constructed Projects
E2166 Practice for Organizing and Managing Building Data
E2587 Practice for Use of Control Charts in Statistical Process Control
Keywords
accounting; agile; agile construction; construction accounting; construction production; construction productivity measure; construction put in place; cost codes; CPIP; effectiveness; efficiency; individual productivity; job labor variance; job layout; job productivity; job productivity assurance and control; job productivity measurement; job tracking; JPAC; JPM; labor productivity; labor variation; lean; lean construction; low cost provider; observed percent complete; planning; predicting profits; predictions; process of project management; production; productivity; productivity measurement; profitability; Six Sigma in construction; SPC; SPC in construction; statistical process control; system productivity; trends; trend monitoring; value engineering; variation; variation measurement in construction; work breakdown structure; Building economics; Construction; Job productivity measurement; Labor hours
ICS Code
ICS Number Code 03.100.30 (Management of human resources); 91.200 (Construction technology)
DOI: 10.1520/E2691-09